Home › Forums › General Discussion › Increasing Line Capacity With Passing Loops › Reply To: Increasing Line Capacity With Passing Loops
August 25, 2014 at 14:08
#3532
Participant
Perhaps not – But removing the entry signals goes a long way for an “overcapacity” system as you put it, until such a point where you’d consider a double track rail. Sure there’s going to be some waiting, but it beats a possible gridlock that you’re not alerted to by the game, or having to double track the entire length. 🙂