Reply To: Increasing Line Capacity With Passing Loops

Home Forums General Discussion Increasing Line Capacity With Passing Loops Reply To: Increasing Line Capacity With Passing Loops

#3532
Mansen
Participant

Perhaps not – But removing the entry signals goes a long way for an “overcapacity” system as you put it, until such a point where you’d consider a double track rail. Sure there’s going to be some waiting, but it beats a possible gridlock that you’re not alerted to by the game, or having to double track the entire length. 🙂