This is actually exactly how our King’s Lynn to Ely (UK) line works, the actual passing loop is a 2 track station with the left track the southbound line (to Ely) and the right track the northbound line (to King’s Lynn) and between each station is a single line. I will be using this layout for my early stations and possibly freight stations.