Hi there,
I’ve installed a freight line with Opel Blitz trucks. The line goes from a coal mine, then to an iron mine and finally to a steel plant. The Opel Blitz truck has a maximum load of 11. I’ve noticed that some trucks left the coal mine with i.e. 9 loads of coal and after leaving the iron mine station they took 7 additional loads of iron. Which means a total of 16 loads.
I’m thankful for the additional money on reaching the steel plant 😉 but I guess this is a bug.